Dynamic QC Manager with extensive experience, specializing in quality control/ assurance and compliance with NBIC & ASME Codes. Proven track record in project management and risk assessment, fostering teamwork and collaboration to achieve timely project deliverables. Skilled in building code packages and NDE coordination, ensuring operational excellence.
- Delek US Holdings Inc -Refining
- Exchangers (C.I.P & full pull)
- Built all QC Packages
- Coordinated with OPS, inspections, engineering & tech service to sign off on all designated hold points, release points, hydros, etc.
-Linde
-Replaced 95 Outlet Pigtails across two reformers.
- Tested 26 total welders both on and off-site.
- Built all weld maps and logs.
- Provided multiple updates per day to the client per their request.
- Coordinated and Tracked all NDE for the entire job.
- Constant communication with field inspectors and production to reduce wait times for NDE and ensure Quality and Production are on the same page with work in progress and work completed.
- GRDA Power Plant
-Extensive mechanical work in pulverizers, Valve replacements. tube repairs, drain pipe replacement
-Marathon (FCC)
-assisted with final walk downs, pulling blinds, verifying packages were ready to sell, data entry.
-Marathon (PDU)
-Performed alterations and routine repairs on 5 propane bullet tanks.
-Built all QC packages, Filled out timesheets and expense reports, managed 6 direct and 1 indirect personnel, wrote daily reports
-Coordinated project timelines and deliverables to ensure timely completion of objectives.
- TRC Fueling Station
- Assembled and installed piping systems according to specifications and blueprints.
- Collaborated with team members to ensure compliance with safety regulations during installation.
- Assisted in troubleshooting and repairing existing pipe systems to maintain operational efficiency.
- Utilized various hand and power tools for cutting, threading, and bending pipes effectively.
-Nyrstar
-Verified correct settings for Fusion welding
-Built weld logs and weld maps for P.E. Piping
- Valero (U-bend replacement and mule ear repair)
- Built all ITP's, Repair Plans, and QC Packages
- Sent all WPSs & WPQs for review
- Requested and Tracked all NDE
- Coordinated all field inspections
- GRDA Power Plant
- Built all QC packages including Code Packages
- Performed all field inspections and many LPT Examinations
- Work scope consisted of mechanical and piping including pad welding and cutting in dutchmans in the boiler.
- Harvest Midstream
- Structural repairs on a cabin heater after an explosion
- identified all WPS's needed and submitted for approval
- Built ITPs and repair plans
- Built QC Packages
- performed LPT on many structural welds and lifting lugs
-CVR Energy
- Erected a new pipe rack, fabricated and installed new heater piping, made three hot tie-ins to existing piping in preparation for installation of a new heater.
-Built all 48 QC Packages
-Submitted WPS's, WPQ's, ITP's, and Repair plans for approval
-Coordinated and tracked all NDE.
-Spool and heat number tracking and accountability.
Worked in Multiple roles ranging from QC inspector, QC Lead, or Quality Manager During the 2024 TAR season. My duties included but were not limited to building code packages, creating welding and flange tracking logs and maps, Ensuring the company remained in compliance with all ASME and NBIC codes and procedures, verifying bolt-ups were completed, final walk-downs, NDE tracking and coordination.
Samsung (Taylor, Texas)
-Experienced in automated and orbital welding inspection, including clean room quality welds for semiconductor installations (per ASME BPE and SEMI standards)
-Perform multidisciplinary field inspections ranging from mechanical, piping, structural, and underground to maintain the highest levels of workmanship
-Track and document construction deficiencies and punch list items, and support project closeout with timely resolution and sign-off.
-Package review, final walkdown, and NDE verification
AWS CWI #23052221