Methodical and detail-oriented drafting professional with proven mechanical skills and 41 years of Oil& Gas Refinery experience. Well-coordinated, conscientious and flexible in incorporating changing design parameters. . Hardworking and passionate job seeker with strong organizational skills .

Ready to help team achieve company goals.

Progressive Project Designer with terrific planning and troubleshooting skills.

Engaging, promoting a "client first" mentality and a valued contributor to team-based environments.

Overview

42
42
years of professional experience

Work History

Project Designer

NEXFOR SRL
07.2015 - Current
  • TRAFIGURA :Campana (Argentina) and Managua (Nicaragua) sites-
  • CABOT Project Reviewer- Campana Site: New 6, 5 MVA Steam Generator and Vulcano Projects-
  • YPF –ISOLUX CORSAN: La Plata Refinery Black Out incident: Evaluation and Cost analysis for Insurance Company.
  • Reviewed technical drawings developed by CAD technicians and drafters.
  • Provided technical support for engineering projects to support accuracy and deadline management.

Electrical Leader

Axion Energy SA
10.2012 - 06.2015
  • Responsible for basic engineering, commitment and commissioning for the new 132 KV interconnection with TRANSBA Campana ET 500 including two 6 Km underground 132 KV feeders , new 132KV/33/13,2 KV refinery substation with GIS technology and 75 MVA transformers and new 33 KV feeders to new process units substations.
  • New Process units: design and cost estimation for revamps of exiting substations and new ones fully dedicated to new Delayed Coker /KNHF/APS/VPS/N2 units
  • Maintained team flexibility and embraced change to adapt within dynamic objetives.

E & I Coordinator, Refinery Flare Relief Project – Leader Engineer

ESSO PA SRL
01.2011 - 10.2012
  • Responsible for existing facilities maintenance and new Electrical & Instruments projects during five-year planned turnaround, besides tie-ins field execution for the Flare Relief Project

Project engineer/Field Electrical leader

EXXON MOBIL
01.2006 - 01.2011
  • Campana Clean Fuels Project- CCFP Team-
  • Responsible for new electrical facilities: including Design Specification, execution, star up and turn over.

Electrical Engineering Specialist

ESSO PA SRL
01.2002 - 01.2006
  • Leader for the Refinery Transformers PCB’s decontamination program, including risk evaluation, national authorities’ relationship, results reporting and controlling, applying the latest worldwide technology from SEA MARCONI (Italy)
  • Equipment Strategy Design for electrical facilities at Campana Site
  • Exxon Mobil Best Net member: Author of Design Guidelines of environment issues in Electrical substations for ExxonMobil American sites
  • Refinery Technical Contact with EMRE (Exxon Mobil Research & Engineering)
  • Responsible of the Campana Electrical Master Plan (long range plan) and the Electrical Special Emphasis Programs (SEP) for reliability improvements and cost reduction
  • Responsible of ARC FLASH HAZARDS Program including design, specification ,coaching , training of contractors and Esso employees, besides equipment revision of existing facilities in order to detect hazards and risk evaluation .
  • EXXON MOBIL GMG (Global Management Guidelines):Global Team Member
  • Electrical Environmental Design Guidelines author, for new Exxon Mobil Global Practices in order to improve safety and reliability in new and existing electrical facilities -
  • User Tester for J D Edwards and SAP software, maintenance and projects modules.
  • Developed effective corrective action plans to fix issues of all priority levels.
  • Interpreted blueprints and technical drawings to analyze upcoming projects.
  • Maintained quality of designs through continuous review and hands-on leadership of entire process.
  • Trained and mentored competent and flexible workforce to meet project needs and promote positive work environment.
  • Provided input to team lead regarding areas for process and procedural improvement.
  • Conducted research to test and analyze feasibility, design, operation and performance of equipment, components, and systems.
  • Interacted with subject matter experts to develop training material and tools for personnel.
  • Participated in formal internal design reviews of proposed products and components.
  • Routed and integrated technical and electrical components for projects.
  • Reviewed technical drawings developed by CAD technicians and drafters.
  • Developed cost estimates and project specifications for proposals.
  • Wrote, reviewed and edited technical document in accordance with template requirements.
  • Conducted feasibility studies for proposed projects using potential ROI and risk management.
  • Analyzed requirements to develop robust solutions to meet Refinery needs.

Electrical Systems Specialist

ESSO PA SRL
01.2001 - 01.2002


Equipment Strategy Design for electrical facilities at Campana Site

  • Exxon Mobil Best Net member: Author of Design Guidelines of environment issues in Electrical substations for ExxonMobil American sites
  • Refinery Technical Contact with EMRE (Exxon Mobil Research & Engineering)
  • Responsible of the Campana Electrical Master Plan (long range plan) and the Electrical Special Emphasis Programs (SEP) for reliability improvements and cost reduction
  • Responsible of ARC FLASH HAZARDS Program including design, specification ,coaching , training of contractors and Esso employees, besides equipment revision of existing facilities in order to detect hazards and risk evaluation .

Reliability & Maintenance Coordinator

ESSO PA SRL
01.1997 - 12.2000
  • Responsible for Reliability and Maintenance of 19 MVA- four steam generators-Powerhouse ,that includes Water Treatment/ Natural Gas facilities/Steam Boilers/ Fire Pumps station, and Gas oil/Crude/Gasoline /Solvents and other products Refinery Tank farm (Off sites),
  • Developed SOPs and change controls pertaining to setup, maintenance and operation of equipment, facility and utilities.
  • Improved and tuned operational efficiency within Offsite Refinery facilities infrastructure and production environment.


Capital Projects Development Section Head

ESSO SAPA
01.1995 - 01.1997
  • Main Projects:
  • New 15 MVA/ 132/33 KV interconnections, between TRANSBA (MEM) and Refinery Power House through a dedicated transformer and 33 KV buried cables
  • New Powerhouse electrical load shedding system
  • New Coke Conveyor designed for reducing environmental issues and new six dolphin docks for 250 meters long vessels.
  • Berth C Revamps after vessel incident
  • Created and maintained project documentation to establish operations framework and enable adherence to preset guidelines.
  • Conducted annual employee performance reviews to recognize achievements and identify areas needing improvement.
  • Scheduled weekly section meetings to review emerging challenges, identify opportunities and recognize high-performing employees.
  • Identified section KPIs and created measurement mechanism to track operations efficiency.
  • Assigned employees to ongoing and special projects to realize adequate staffing and meet production schedule parameters.
  • Managed project technical, schedule and cost risk factors to facilitate completion while minimizing negative outcomes.
  • Resolved customer service escalations to promote mutually beneficial outcomes.
  • Executed quality assurance audits and addressed non-complying issues to improve section performance.
  • Compared production costs to budgetary guidelines and adjusted variables to achieve budget compliance.
  • Assisted in recruiting, hiring and training of team members.
  • Interacted well with customers to build connections and nurture relationships.
  • Reported issues to higher management with great detail.


New Facilities Execution Section Head

ESSO SAPA
08.1993 - 01.1995
  • On sites (All main process units: Delayed Coker-FCCU-PWF- MDT, KNHF, new Benzene Unit, FCCU Upgrades, APS /VPS revamp) -Capital Projects-
  • Created and maintained project documentation to establish operations framework and enable adherence to preset guidelines.
  • Conducted annual employee performance reviews to recognize achievements and identify areas needing improvement.
  • Scheduled weekly section meetings to review emerging challenges, identify opportunities and recognize high-performing employees.
  • Delivered weekly project updates to management to enhance program visibility and promote improved project performance.

Projects Development Section Head

Campana Refinery- ESSO SAPA
01.1992 - 08.1993
  • Created and maintained project documentation to establish operations framework and enable adherence to preset guidelines.
  • Conducted annual employee performance reviews to recognize achievements and identify areas needing improvement.
  • Scheduled weekly section meetings to review emerging challenges, identify opportunities and recognize high-performing employees.
  • Delivered weekly project updates to management to enhance program visibility and promote improved project performance.

Maintenance and Projects Refinery Section Head

ESSO SAPA
08.1987 - 07.1992
  • Turn around Refinery Mechanical Manager responsible for all the resources(planning, safety, manpower/ contracts/materials) during the Refinery turn around.
  • Maintained project documentation to establish operations framework and enable adherence to preset guidelines.
  • Conducted annual employee performance reviews to recognize achievements and identify areas needing improvement.
  • Scheduled weekly section meetings to review emerging challenges, identify opportunities and recognize high-performing employees.
  • Delivered weekly project updates to management to enhance program visibility and promote improved project performance.
  • Identified section KPIs and created measurement mechanism to track operations efficiency.
  • Assigned employees to ongoing and special projects to realize adequate staffing and meet production schedule parameters.
  • Managed project technical, schedule and cost risk factors to facilitate completion while minimizing negative outcomes.
  • Resolved customer service escalations to promote mutually beneficial outcomes.
  • Executed quality assurance audits and addressed non-complying issues to improve section performance.
  • Improved user service quality to promote customer loyalty and enhance operations efficiency.
  • Updated and resolved incidents and managed accessorial charges objectively while maximizing profit.
  • Scheduled employees for shifts, taking into account customer traffic and employee strengths.
  • Reported issues to higher management with great detail.
  • Mitigated business risks by working closely with staff members and assessing performance.
  • Reduced operational risks while organizing data to forecast performance trends.

Planning and Maintenance Engineer

ESSO SAPA
01.1984 - 01.1987

Maintenance Engineer

ESSO SAPA
01.1982 - 01.1984
  • Visually inspected and tested machinery and equipment, performing routine preventive maintenance.
  • Documented maintenance activities and confirmed compliance with relevant regulations.
  • Diagnosed and resolved machine operation variations and equipment problems.
  • Performed troubleshooting and repair for complex electrical equipment.
  • Developed preventive maintenance schedules to minimize downtime and optimize performance.
  • Reviewed technical documentation to complete equipment maintenance and repair.

Junior Engineer

ESSO SAPA
04.1981 - 01.1982

Education

MBA - Magister in Business Management

USAL (del Salvador ), Capital Federal, Buenos Aires, Argentina
06.1986

Bachelor of Science - Electrical Engineering

National Technology University (UTN), General Pacheco ,Buenos Aires
02.1980

Skills

  • Private Sectors
  • Documenting Hours Worked
  • Microsoft Excel
  • Site Appraisals
  • Site Layout
  • Special Requirements
  • City and County Regulations
  • Customer Accounts Management
  • Testing
  • Best Practices and Standards
  • Project Architecture
  • Fabrication and Assembly
  • Program Improvements
  • Microsoft Office
  • Project Requirements
  • Engineering Operational Functions

Languages

Spanish
Native language
English
Advanced
C1
Italian
Intermediate
B1

Timeline

Project Designer - NEXFOR SRL
07.2015 - Current
Electrical Leader - Axion Energy SA
10.2012 - 06.2015
E & I Coordinator, Refinery Flare Relief Project – Leader Engineer - ESSO PA SRL
01.2011 - 10.2012
Project engineer/Field Electrical leader - EXXON MOBIL
01.2006 - 01.2011
Electrical Engineering Specialist - ESSO PA SRL
01.2002 - 01.2006
Electrical Systems Specialist - ESSO PA SRL
01.2001 - 01.2002
Reliability & Maintenance Coordinator - ESSO PA SRL
01.1997 - 12.2000
Capital Projects Development Section Head - ESSO SAPA
01.1995 - 01.1997
New Facilities Execution Section Head - ESSO SAPA
08.1993 - 01.1995
Projects Development Section Head - Campana Refinery- ESSO SAPA
01.1992 - 08.1993
Maintenance and Projects Refinery Section Head - ESSO SAPA
08.1987 - 07.1992
Planning and Maintenance Engineer - ESSO SAPA
01.1984 - 01.1987
Maintenance Engineer - ESSO SAPA
01.1982 - 01.1984
Junior Engineer - ESSO SAPA
04.1981 - 01.1982
USAL (del Salvador ) - MBA, Magister in Business Management
National Technology University (UTN) - Bachelor of Science, Electrical Engineering
RICARDO P. MARCACCIO